Factory Construction
Engineering management and technical staffing for new-build and expansion plants, cleanrooms and utilities

From modular construction and marine works to infrastructure, data centres and EPC delivery KUTA helps contractors, design institutes and owners find the engineers and project leaders who have already delivered a comparable scope, at the stage you need them.
Engineering and technology hiring looks straightforward on paper and is rarely so in practice. A structural engineer on a modular yard, an MEP coordinator on a data-centre fit-out and a controls engineer on an EPC package can share a job title and almost nothing else. What separates them is the project type, the delivery stage and the standards regime they have actually worked under.
KUTA's consultants on this desk come largely from engineering and project backgrounds. They scope a role by asking what the person will be accountable for in the first twelve months design authority, package ownership, interface control or commissioning sign-off and then search against that, rather than against a keyword list. That is what keeps a shortlist short.
Factory construction, offshore modules, entertainment & resorts, LNG engineering, data centres and specialty tech — six directions where we have depth and a proven delivery record

Engineering management and technical staffing for new-build and expansion plants, cleanrooms and utilities

Design, fabrication, assembly and commissioning talent for FPSO topsides, jackets and offshore platforms

Build-phase recruitment teams and full-discipline delivery for large theme parks and resorts

Multi-discipline engineers and project management teams for liquefaction lines, tanks and terminals

MEP contractors, HVAC and critical-facility engineers for data centre new-build and expansion

Targeted search for scarce specialists in NDT, welding engineering, sea-trial command, vessel operations and ship management
From initial evaluation to decommissioning — every stage has its own role requirements, with project management running throughout
Opportunity screening, scope and siting — investment and market research roles
Technology selection, CAPEX estimate and process concept — process and cost-control experts
Basic design and long-lead equipment enquiries — overall, process and procurement interface roles
Multi-discipline drawings and procurement — structural, piping and E&I teams mobilised together
Site organisation, schedule and quality control — project controls and HSE resident on site
Mechanical completion, single-unit and integrated start-up — commissioning teams added to schedule
Post-start-up optimisation, turnarounds and upgrades — plant engineers and O&M management
Retirement, demolition and site remediation — compliance and dismantling project management
Project management runs through every stage — one owner for schedule, cost and quality
China · integrated chemical site
A 60,000-tonne engineering plastics integrated site in China BASF's largest ever investment at USD 10 billion. KUTA placed project-management and technical specialists, pre-screening for cross-city mobility and international experience.
China · parallel projects
Several multi-billion-dollar FPSOs in China (Yellowtail, Uaru, HH, Longtail) needing around 300 owner's representatives. KUTA delivered 50 engineers screened on owner-side field evidence rather than job titles.
A theme-park project with more than RMB 50 billion invested. KUTA set up a dedicated recruitment team, reviewing candidates and consultant feedback monthly to support rapid staffing.
Built by a five-country EPC consortium. KUTA supplied more than 60 engineers across structural, piping, welding, mechanical, electrical, instrumentation and NDT roles.