Hotline: +86 21 6487 6068 / 6487 6082 enquiry@kuta-hunting.com
Marine · Petrochemical · Oil & Gas · Cross-border Talent
Industrial project site
Case Studies

Our delivery speaks for itself

Every case reflects a real business scenario: who the client was, what made it difficult, how we solved it and what we delivered  not a generic line about "successfully placing XX role".

Engineering · Technology · Energy · Manufacturing · Cross-border · Consulting
Factory Construction

BASF greenfield chemical plant

China · integrated chemical site

BASF greenfield chemical plant

A 60,000-tonne engineering plastics integrated site in China BASF's largest ever investment at USD 10 billion. KUTA placed project-management and technical specialists, pre-screening for cross-city mobility and international experience.

25hires
15+disciplines
50 daysaverage time to hire
Read case study
Offshore Modules

FPSO programme for a global oil & gas major

China · parallel projects

FPSO programme for a global oil & gas major

Several multi-billion-dollar FPSOs in China (Yellowtail, Uaru, HH, Longtail) needing around 300 owner's representatives. KUTA delivered 50 engineers screened on owner-side field evidence rather than job titles.

50hires
20+disciplines
50 daysaverage time to hire
Read case study
Entertainment & Resorts

Universal Beijing Resort

Beijing · Tongzhou

Universal Beijing Resort

A theme-park project with more than RMB 50 billion invested. KUTA set up a dedicated recruitment team, reviewing candidates and consultant feedback monthly to support rapid staffing.

40hires
10+disciplines
50 daysaverage time to hire
Read case study
LNG Engineering

Yamal LNG

Russia · Arctic

Yamal LNG

Built by a five-country EPC consortium. KUTA supplied more than 60 engineers across structural, piping, welding, mechanical, electrical, instrumentation and NDT roles.

60hires
10+disciplines
30 daysaverage time to hire
Read case study
Industrial Digitalisation

Digitalisation provider for equipment manufacturing

Shanghai

Digitalisation provider for equipment manufacturing

Built around a large equipment-manufacturing group's industrial cloud platform, KUTA phased in architecture, development, AI, product and data roles to keep platform launches and project delivery on schedule.

15hires
10+disciplines
50 daysaverage time to hire
Read case study
New Materials

Leading speciality chemicals group

Zhejiang

Leading speciality chemicals group

The functional chemicals and new-materials arm of a RMB 100bn industrial group. KUTA phased in R&D, process, testing and digital roles against new-product launches and base expansion.

60hires
20+disciplines
45 daysaverage time to hire
Read case study
New Energy

Global offshore wind OEM and EPC

UK · North Sea

Global offshore wind OEM and EPC

An offshore wind project in the Scottish North Sea using large turbines on monopile and jacket foundations. KUTA phased electrical, safety and smart-O&M roles against development, construction and operations milestones.

8hires
10+disciplines
60 daysaverage time to hire
Read case study
Oil & Gas

Global oil & gas major (China operations)

Beijing · Shanghai · Xiamen

Global oil & gas major (China operations)

A multi-centre footprint spanning an R&D centre, procurement and supply chain, and joint-venture support. Roles had to satisfy a strict compliance regime and cross-time-zone collaboration.

7hires
10+disciplines
60 daysaverage time to hire
Read case study
Aerospace

eVTOL air-taxi OEM

China

eVTOL air-taxi OEM

At the critical point between prototype validation and certification. KUTA searched across industries on capability transferability, covering flight control, airworthiness, aerodynamics and battery systems.

3hires
8+disciplines
60 daysaverage time to hire
Read case study
Shipbuilding

Shipyard group

Dalian · island yard

Shipyard group

As the yard moved into takt-based construction and batch delivery, KUTA screened for genuine on-site commitment and working-level English, delivering project management, survey coordination, process and commissioning roles.

25hires
10+disciplines
50 daysaverage time to hire
Read case study
Overseas Staffing

World-class mining project

Africa

World-class mining project

More than USD 20 billion invested, with tens of thousands of people from over 40 countries on site. KUTA mobilised translation, quality, logistics, E&I and planning roles against a tight window.

52hires
10+disciplines
15 daysaverage time to hire
Read case study
Testing & Certification

International certification body

China

International certification body

A multinational certification and risk-management body issuing compliance passports for Chinese manufacturing. KUTA widened the search from peers to field people who had made independent technical judgements.

45hires
7+disciplines
50 daysaverage time to hire
Read case study
Certain project details remain subject to confidentiality agreements. For more sector references, contact a consultant privately.