
eVTOL air-taxi OEM: flight-control and airworthiness team
The company is at the critical point between prototype validation and certification and industrialisation. Roles are few, but each maps directly onto a certification milestone, so a late hire delays the whole schedule.
Background
The client is an eVTOL air-taxi OEM working on a tilt-ducted-fan architecture. Its first full-scale aircraft has entered the certification acceptance stage with close to a thousand conditional orders, moving from prototype flight testing toward certification and commercial operation.
At this point between prototype validation and certification, demand is concentrated in flight-control systems, airworthiness, aerodynamics and overall design, and battery systems.
Client Challenge
- Fewer than 5% of the market is hybrid-capable, and the roles span aviation and automotive engineering languages
- Airworthiness engineers are nearly unobtainable; certification experience matters more than years
- Flight-control and battery roles are contested by aerospace, EV and big-tech employers at once
How KUTA Delivered
Search across industries on transferability
Look beyond peers into automotive, drones and rail for transferable capability
Screen airworthiness roles on certification depth
Judge by the certification process the candidate actually worked through, not years or certificates
Lead with early involvement in certification milestones
Replace salary-only competition with the chance to shape certification early
Treat a landed hire as the finish line
Assess start-up fit up front to reduce early attrition