Hotline: +86 21 6487 6068 / 6487 6082 Enquiry@kuta-hunting.com
Marine · Petrochemical · Oil & Gas · Cross-border Talent CN EN
Engineering and technical team on a new-build process plant project
Service · Engineering Staffing

Engineering Staffing for New-build Projects

A new plant, a new line or a major expansion needs dozens of engineers and technicians at precisely the right moment in the schedule. KUTA builds that workforce discipline by discipline, and releases it cleanly when the project hands over.

Scope: new-build · expansion · revamp projectsMobilised in batches against construction milestonesDisciplines: civil → mechanical → electrical → commissioning
How it differs

Project Manpower Is a Schedule Problem

Recruiting for a plant that does not yet exist is not the same as filling permanent vacancies. The requirement is driven by construction sequence, not by headcount budget: civil crews are needed first and released first, commissioning specialists arrive last and matter most.

KUTA plans the requirement against your construction schedule, sources by discipline and certificate, and mobilises in batches — so people arrive when the site can actually use them, rather than all at once or too late.

1 schedule
Manpower plan built from your construction milestones, discipline by discipline
4–8 weeks
Typical lead time from approved plan to first batch on site
100 %
Certificates and qualifications verified before mobilisation

Peak Cover

Extra hands for the fabrication, erection and pre-commissioning peaks without permanent additions to payroll

Verified Competence

Welding, electrical, lifting and safety certificates checked and recorded before anyone travels

Clean Demobilisation

Release dates agreed up front, with handover documentation and an orderly exit at project close

Scenarios

Typical Project Situations

Greenfield Construction

A new plant or production line where the owner has no local engineering team to draw on yet

Expansion & Revamp

Brownfield tie-ins and debottlenecking work that must be delivered inside a short shutdown window

Overseas Delivery

Projects in the Middle East and Southeast Asia, where local recruitment alone cannot fill the schedule

What's included

What a Staffing Delivery Includes

Everything between the approved manpower plan and a productive person on site.

Discipline-by-discipline Sourcing

Targeted search by discipline, certificate and plant type, so candidates have done this kind of work before.

Qualification Verification

Trade certificates, safety training and site-access requirements verified and documented before mobilisation.

Contracts & Payroll

Project-based contracts, insurance and payroll administration handled for every person we place.

Phased Mobilisation

Batches released against the construction schedule, with replacements covered if someone drops out before travel.

Also: Dispatch & HR Outsourcing → See Project Case Studies
Questions

Questions Clients Ask First

Q1 · SCOPE

Can you cover a whole discipline, not just individuals?

Yes. We staff by discipline and by phase, from a handful of specialists to a full construction or commissioning team, based on the approved manpower plan.

Q2 · TIMING

How early should we engage you?

As soon as the construction schedule is firm — typically four to eight weeks before the first batch is required on site, and earlier for scarce disciplines.

Q3 · CONVERSION

Can strong performers join us permanently?

Yes. Conversion terms are agreed in the original contract, so high performers can transfer to your own payroll at project close.

Q4 · EXIT

What happens when the project ends?

Release dates and demobilisation terms are locked before signing; exits are staggered to match the schedule and handover documentation is completed.

Engineering Staffing

Staff the schedule, not the org chart.

Send the project scope, disciplines and required-on-site dates, and our consultants will come back with a delivery assessment.

Or email us directly at Enquiry@kuta-hunting.com · Hotline +86 21 6487 6068 / 6487 6082